From Fallen Tree to Permitted New Build
A mature tree came down during a North Shore storm and destroyed the detached guest house on Rosebery Avenue in West Vancouver. It was a total loss — roof breached, framing collapsed, water pouring in. Rebuild was the only real option.
Eurohouse Construction managed the entire process from day one: working with the homeowner and their insurer on scope and estimates, designing a modern replacement, engineering it, taking it through the District of West Vancouver's development permit and design board review, consulting with neighbours, and building it.
Full Project Scope
- Damage assessment and insurance scope documentation
- Demolition of storm-damaged guest house
- Architectural design for new accessory dwelling
- Structural and geotechnical engineering
- Development permit application and approval
- District of West Vancouver design board review
- Neighbour notification and consultation process
- New construction — foundation through finishing
- Coordination with insurer throughout
Project Details
Before & After
Before — Storm Damage
After — Approved Design
Approved Design — 3D Visualizations
West Coast contemporary accessory dwelling — designed, engineered, and permitted through the District of West Vancouver
How We Managed This Project
Emergency Response & Documentation
Site assessment, structural evaluation, temporary weather protection. Comprehensive photo documentation and damage report prepared for insurance.
Insurance Coordination & Scope
Worked directly with the homeowner and insurer to establish scope, prepare estimates, and build the case for full rebuild vs. repair.
Architectural Design & Engineering
Designed a modern West Coast contemporary accessory dwelling. Structural and geotechnical engineering completed for District requirements.
Development Permit & Design Review
Prepared and submitted full development permit application. Presented design to the District of West Vancouver design board. Managed neighbour consultation process.
Demolition & Site Preparation
Removed damaged structure and debris. Prepared site for new construction with proper drainage and foundation work.
Construction & Completion
New build from foundation through finishing — modern envelope, quality materials, and craftsmanship consistent with the primary residence.
Tree Damage? We Can Help.
From emergency stabilization through design, permitting, and rebuild — Eurohouse manages the full process so you don't have to. Serving West Vancouver, North Vancouver, and Whistler.
Contact Our Team →