Western Maritime Institute Ladysmith campus exterior — former elementary school building with blue trim and signage, renovated by Eurohouse Construction
Commercial Construction

Western Maritime Institute — Ladysmith Campus

Ladysmith, BC • Vancouver Island

From 1970s Elementary School to Modern Marine Training Facility

The Western Maritime Institute operates one of BC's premier marine training campuses out of a former elementary school in Ladysmith on Vancouver Island. The building — original 1970s construction — had never been brought up to modern commercial standards. It needed a full interior renovation to support the Institute's growing program and meet current building code requirements.

The constraint was absolute: the entire renovation had to be completed during the 5-week summer holiday window while students were off campus. There was no flexibility on the reopening date. Eurohouse mobilized a dedicated crew, worked around the clock, and delivered the completed facility on time — ready for students returning in September.

This is the kind of project that defines a contractor. Not a luxury showpiece — a demanding, schedule-driven institutional renovation that required relentless execution, smart sequencing, and zero excuses. We're proud of the result and proud to be the construction partner for WMI. We also completed their Surrey campus, which will be documented as a separate project.

5
Weeks to Complete
24/7
Around the Clock
2
WMI Campuses Completed

Project Details

Project
Western Maritime Institute — Ladysmith Campus Renovation
Location
Ladysmith, BC — Vancouver Island
Category
Commercial & Institutional Renovation
Client
Western Maritime Institute
Original Building
1970s elementary school
Delivery
5-week fast-track, 24/7 operations
Constraint
Summer holiday window — hard reopening deadline
Status
Completed — on time, on budget

Before & After

The original 1970s interior vs. the renovated facility — new flooring, ceiling systems, HVAC, partitions, lighting, and finishes throughout

Before — 1970s Condition

Original 1970s lounge area with exposed ductwork and dated finishes at Western Maritime Institute Ladysmith Original kitchen area with dated cabinetry and countertops at Western Maritime Institute

After — 2024 Renovation

Renovated interior with new built-in shelving, partitions, skylights, and modern finishes New partition walls and skylight detail in renovated Western Maritime Institute

Construction Progress

Five weeks of around-the-clock work — flooring, HVAC, ceiling systems, partitions, millwork, and finishes

New commercial flooring being installed over old substrate at Western Maritime Institute New HVAC ceiling diffuser installed in drop ceiling grid at Western Maritime Institute Ceiling tile and HVAC system installation during renovation Material selection — Johnsonite wall base sample colour-matched to new flooring Completed wall tile installation with clean baseboard trim detail Interior finish detail at the completed Western Maritime Institute Ladysmith campus

The Campus

Western Maritime Institute's Ladysmith facility — classrooms, training areas, marine simulation equipment, and outdoor training yard

Western Maritime Institute Ladysmith campus — former elementary school with training outbuildings Marine training simulation equipment and outdoor yard at Western Maritime Institute Renovated classroom and workspace with exposed timber ceiling and new ductwork at Western Maritime Institute

The Challenge: 5 Weeks, No Extensions, Around the Clock

Marine training programs run on fixed schedules. The Institute needed the Ladysmith campus fully renovated and operational before students returned from summer break. That gave us exactly 5 weeks — and the existing building was original 1970s construction with outdated mechanical systems, deteriorated finishes, and no margin for error. Eurohouse ran 24/7 shifts, coordinated all trades in tight sequence, and handed over a finished facility on the agreed date.

Multi-Campus Relationship

Following successful delivery of the Ladysmith campus, Western Maritime Institute engaged Eurohouse to renovate their Surrey campus as well — a separate project that demonstrates the trust built through reliable execution. When a client comes back for a second facility, the first one spoke for itself.

What Eurohouse Delivered

🏗️

Full Interior Demolition

Strip-out of all 1970s finishes, flooring, ceiling systems, and non-structural partitions to expose the shell for rebuild.

❄️

HVAC & Mechanical

New ductwork, ceiling-mounted diffusers, ventilation, and mechanical systems replacing original school-era equipment.

💡

Electrical & Lighting

Updated electrical throughout with new commercial lighting, data infrastructure, and code-compliant distribution.

🪵

Flooring & Finishes

Commercial-grade LVT flooring, wall tile, paint, and trim throughout all classrooms, offices, and common areas.

🔲

Ceiling Systems

New drop ceiling grid with acoustic tile, integrated HVAC diffusers, and fluorescent lighting panels.

📐

Partitions & Millwork

New interior partition walls, observation windows, built-in shelving, and custom millwork for classrooms and offices.

Commercial or Institutional Renovation?

From 5-week fast-track campus renovations to luxury presentation centres — Eurohouse delivers commercial projects with the same reliability we bring to every job. On time. On budget. No excuses.

Start Your Project →