Insurance restoration kitchen with marble waterfall island and custom wood cabinetry in West Vancouver
Insurance Restoration

Multi-Phase Residential Recovery

West Vancouver, BC

Insurance Restoration & Home Warranty Foundation Repair

This complex residential recovery project in West Vancouver required coordinated delivery across two independent claims: an insurance restoration following major water ingress, and a Home Warranty claim addressing concealed foundation leaks discovered during construction.

Eurohouse acted as the single point of construction responsibility, managing scope separation, documentation, scheduling, inspections, and final delivery. The client's comprehensive policy coverage allowed us to work flexibly within approved budgets while helping them realize their design vision for the restored spaces.

Before production began, we created detailed 3D renderings of every space—allowing the homeowner to see exactly what they would receive and approve all finishes before construction started. This visualization process eliminated surprises and ensured complete satisfaction with the final result.

Our Approach to Insurance Restoration

  • Pre-Production Visualization: 3D renderings let clients see the finished result before construction begins
  • Design Flexibility: We help clients maximize their coverage while achieving their vision
  • Single Point of Responsibility: One contractor managing all claims, trades, and documentation
  • Transparent Communication: Direct collaboration with adjusters, warranty representatives, and inspectors

Project Details

Location
West Vancouver, BC
Project Type
Dual-Claim Recovery
Insurance Provider
Northbridge Financial
Scope
Interior Restoration + Foundation Repair
Services
Insurance Restoration, Home Warranty Repair, 3D Visualization

Phase 1 — Insurance Restoration

  • Selective demolition of water-damaged finishes
  • Moisture remediation and structural drying
  • Replacement of insulation and vapor barriers
  • Reconstruction of ceilings, walls, and partitions
  • Subfloor preparation and flooring replacement
  • Custom cabinetry and millwork
  • Interior carpentry, drywall, painting
  • Trade coordination (mechanical, electrical, flooring)

Phase 2 — Home Warranty Foundation

  • Exterior excavation along affected walls
  • Assessment of concrete foundation conditions
  • Crack repair and structural sealing
  • Waterproofing membrane installation
  • Drainage protection systems
  • Perimeter backfill and site restoration
  • Coordination with warranty inspectors
  • Integration with interior restoration sequence

Facing an Insurance Claim?

We help homeowners navigate insurance restoration with transparency, design flexibility, and professional project management. See your restored home before construction begins.

Discuss Your Project →